What to Confirm When Your Required Date Changes
A required date is a review item, not a setting. When it moves, the useful request says what changed and what the new date has to achieve.
Drew Brodfuehrer
What the estimating and shop teams explain to buyers, written down. Process choices, drawing preparation and the decisions behind component work.
A required date is a review item, not a setting. When it moves, the useful request says what changed and what the new date has to achieve.
Drew Brodfuehrer
Freight is planned from the destination and the shape of the load. Access, dimensions and the receiving arrangement decide more than the distance does.
KorFab Marketing Team
Customer supplied material changes who owns the risk. Specification, condition, allowance and delivery all have to be agreed before anything is cut.
Drew Brodfuehrer
A drawing tells the shop what size a part is. Marking which dimensions must hold tells it what the part has to do, and that is what a quote is built on.
Drew Brodfuehrer
Material and finish are a single decision on a visible component. Each material carries its own finish path, and the pair has to be settled together.
KorFab Marketing Team
A second venue is rarely a copy of the first. Confirming what stays the same and what does not is what makes a multi location order work.
Dan Caronna
A fit out runs on a fixed opening date and a lot of small components. Geometry, quantity and finish have to be settled before the schedule gets tight.
KorFab Marketing Team
The shop makes and delivers. Someone else installs. Most site problems on a healthcare package come from that boundary not being written down.
Dan Caronna
Healthcare projects run on contractor supplied drawings and facility requirements. The fabrication scope is components, and the order has to reflect that clearly.
Dan Caronna
Supports and brackets in a facility package are small parts with fixed interfaces. Confirming the interfaces before ordering avoids the fit problem later.
Dan Caronna